Library: Report, Lexicon Energy Consulting, Inc.

2 results

Results

Verification of Efficiency Vermont's Energy Efficiency Portfolio for the ISO-NE Forward Capacity Market Final Report

Date Published: July 29, 2010     Document Type: Report

In 2006, the Independent System Operator of the New England electric grid (ISO-NE) created a Forward Capacity Market (FCM) to ensure that the region has sufficient capacity to meet its peak demand needs. This market-based initiative allows for demand resources, including energy efficiency, to compete directly with generation resources to provide capacity. In order to participate in the market, providers of energy efficiency resources must demonstrate that their efficiency savings are verified in compliance with the ISO-NE standards established for this purpose.

Final Report to the Energy Efficiency Utility Contract Administrator Verification of EVT 2008 Claimed Annual MWh Savings, Coincident Summer and Winter Peak Savings And Total Resource Benefit (TRB)

Date Published: June 12, 2009     Document Type: Report

On March 23, 2009, Efficiency Vermont (EVT) submitted its Year 2008 Preliminary Savings Claim for calendar year 2008 activities operating as the statewide energy efficiency utility (EEU). As provided for in the contract between Efficiency Vermont and the Vermont Public Service Board (PSB), the Department of Public Service (DPS or Department) undertook a review of EVT's 2008 activities, verifying the energy savings, coincident peak savings and Total Resource Benefit (TRB) amounts claimed by EVT. This review was conducted by West Hill Energy and Computing, with assistance from Carole Welch, Cx Associates, GDS Associates and Lexicon Energy Consultants and oversight provided by the DPS. This report made to Michael Wickenden, Contract Administrator for the PSB, summarizes the results of that review.